Kitchen Remodel Project Risk Management You acquire knowledge risk management analysis a project. The project remodeling family kitchen. To prepare project, research kitchen remodeling work considerations project success. Hypothesize effect risk management project.

Project Risk Management

Overall goal of risk management is to guarantee an increase of opportunities and decrease of risk. Risks are uncertain events that occur in the process of project planning and implementation and can have both negative and positive effects (Metzger, 2006). Risk management entails definition of procedures involved in implementation of a project and the likely risks to be encountered in the project activities. The purpose of coming up with a risk management plan is to come up with the ideal framework for use by the project team. The team will use the risk management plan to identify risks and developing strategies that mitigate, enhance or change the negative risks. This paper presents a risk management plan for a family kitchen remodel identifying the risks related, assessing and monitoring mitigations measures (Wysocki, 2009).

Process of risk management

In risk management, the process of analyzing the type, degree and visibility of the risk related is important. This will facilitate the organization of the kitchen remodeling aspects and appraising necessary precautionary measures for successful completion of the project. Process of risk management will start at the project conception/initiation phase. This is in order to capitalize on ensuring maximum benefit in project implementation and completion. The role of the project manager will be to ensure that the risks are identified, analyzed and minimal negative effect ensured. For the purposes of implementing the kitchen remodeling project the process of risk management will entail; risk identification; qualitative assessment of risk-perform, enumeration and appraising risk mitigation measures; monitoring and control and risk closure.

The process of risk management is continuous flowing from one phase to the next such that; phase one of risk management will be followed in sequence by the second phase (Wallis, 2012). Initially, the first phase of the Risk Management process is risk assessment, including risk identification and risk analysis. The next phase is the appraisal of mitigation measures followed by implementation of risk management measures and control of measures. The processes are iterative since in each phase the previous phase will be factored in so that to guarantee the desirable outcome.

The approach for this project is strategic, as well as tactical to ensure that all risks principles are embedded within the project team. Mitigation responses will be assigned to each identified risk and utilized to create a response risk plan. This will ensure that each risk is mitigated properly and does not impact the project's success.

Risk Identification

Risk identification is the process of determining which risk may affect the project and documenting their characteristics. Risk identification is a critical step in the risk management process to ensure a complete list of risks is identified. The risk identification process involves the participation of the project manager, project team members, the family member and authority persons involved in the construction (Wallis, 2012). The identification process is iterative; therefore, the frequency of iteration and who participates will vary based on the severity of the situation. The following information gathering techniques will be used to identify risks for the kitchen remodel project: Brainstorming; Delphi technique; Interviewing and cause Analysis. Information gathered by using these techniques will be useful for identifying risks and ensure all key stakeholders are engaged (Wysocki, 2009).

The family kitchen remodeling project is likely to face up with the following challenges. The list is not exhaustive but, those identified are likely risks and they will serve the purposes of the risk management plan. The Project Manager will be responsible for identifying and communicating potential risk and their possible impacts to the client. Additionally, everyone shall have specific responsibilities allocated at the different level of the project management team. This process will allow the client to make an informed decision to assume the risks voluntarily and remain engaged in the risk management process.

Budget Over-run

Kitchen remodeling will require the purchase of fittings and equipment's whose costs may be highly fluctuating. These fluctuations may cause unintended changes in cost of the project on the overall. Since the project involves family kitchen remodeling, funds available to meet the costs of desired remodeling may be insufficient. In this case project may stall or come to a sudden halt in the middle. To mitigate the observed risk, the project manager will need to renegotiate with kitchenware suppliers or the family so that budgetary needs are met. The project manager may also need to delay the project works so that adequate funds are available...

Where the project may be stalled down by price raging and competition among competitors, the project manager should consider implementing a standardized process. The process shall cater for responding to vendor inquiries and ensure procurement contracting proceedings are followed accordingly to lock in reasonable rates early.
Inexperienced staff or Project Manager

Owing to an inexperienced staff or project manager, learning curves may decrease productivity. Training may impact overall timeline, high turnover may occur and project will delay due to lack of attention. The project manager will mitigate this risk by, hiring the right project team to leverage knowledge, implement training early, designate a more senior person to coach or mentor and put a strong quality assurance process in place to ensure project alignment.

Complexity of design requirements

Design may be to complex or unattainable considering the previous model of existing kitchen and house structure. Due to design requirements and likely complexity, design implementation decisions need to be delayed and complexity regarding layout be discussed. The project manager will mitigate this risk by utilizing visual mockup designs to clearly layout the design architecture and ensure all design architecture has been approved before beginning project work.

Delays or failure in kitchen inspection

Kitchen remodel designs may require inspection and approval by authorized bodies. The delay or failure of such an inspection my extend the project completion period and increase costs stretching the budgetary limits. This may also reduce the morale of the project team and the family members. The project manager will need to make prior arrangements with inspectorates and put inspection in the checklist. To make the process of inspection smooth all documentation should be in order and there should be a walk-through process prior inspection. Invitation of the inspector to the site to review and provide pre-inspection certificates should be done early in advance.

Project dependencies

Due to project dependencies delay on one aspect of the project in terms of timeline, will lead to the overall project delay. The impact is greater if issues occur and the project manager is incapacitated to take control and foresight to manage the project manager. Additionally, project performance and budget will most likely be impacted. The project manager will mitigate this risk by decomposition/compress timeline; adding another analysis phase; ensuring project specifications are detailed; allowing more time to the project schedule.

Dwindling interest from the stakeholder

If the stakeholder/sponsor is not engaged or interested in the project may experience lack of support, lack of long-term commitment, changes or concerns will not get addressed in a timely manner and taste will change once project is completed. To mitigate these risks, the project manager will ask household members to participate by forming part of the project team. They should be involved in planning and making arrangement on the requirements gathering. The project manager should create a user group to surface concerns and build enthusiasm; ask for help from the family members in order to generate excitement. Encourage them to be proactive in sourcing for resources and ideas when need is present.

Uncertainty in economic Conditions

Due to changes within the economy, the project may most likely experience uncertainty. This may cause decisions to be delayed, lack of focus or commitment from stakeholders, or the project may end owing to the severity or impact. The project manager will mitigate this risk by renegotiating the scope to fit within the funding available and holding off on initiating project development until certainty in economic condition resumes or adequate budget or lesser scope is established.

New competition/competitors

Due to competition or competitors, the project may experience lack of coordination, difficulty managing vendors, or procurement process may become cumbersome and impact project timeline. The project manager will establish a formal approval process and create a steering committee to represent the entire stakeholder community.

Sudden changes in weather conditions

Owing to unpredictable weather conditions, acts of God like a catastrophic event, hurricane tornado can most likely occur. The project manager will mitigate this risk by establishing an insurance plan that will cover loss; reviewing the model "ordinances" to ensure all existing regulations and enforcement mechanisms are sufficient; in cases where adequate lead time is available-take action to reduce the risk (i.e., Evacuate or if a flood is coming move to higher grounds.

Insufficient funding

Owing to insufficient funding the project timeline and budget will most likely be impacted. To mitigate this risk, the project manager will renegotiate scope to fit within the funding available and do not start the project…

Sources used in this document:
References

Metzger, D.Z. (2006). Systems Approach to Strategic Project Management. International Journal of Project Management, 7(3), 56-106.

Wallis, P. (2012). Risk management achieving the value proposition. . Government Finance Review,, 28(1), 36-42.

Wysocki, K., Robert (2009). Effective Project Management. United States of America: Wiley Publishing, Inc.
Cite this Document:
Copy Bibliography Citation

Related Documents

Risk Management the Objective of This Study
Words: 1690 Length: 5 Document Type: Essay

Risk Management The objective of this study is to discuss the role and nature of organizational risk management in justice and security organizations and why it is so important. The following will be addressed in the assessment; (1) risk planning and resource identification; (2) management of risk in justice and security organizations; (3) costs associated in managing risk; (4) consequences of failing to manage risk; and benefits; and (5) benefits a

Risk Management Applications in Hospitals the Concept,
Words: 1322 Length: 4 Document Type: Essay

Risk Management Applications in Hospitals The concept, usage and learning of risk management phenomenon are important for all institutions in healthcare industry. The most important purpose of risk management in healthcare industry is learning from errors, it is these human errors that pave the way for us to learn prepare and not repeat these errors again. These errors can lead to a medical incident and the learning from them occurs when these

Risk Management I Will Measure
Words: 640 Length: 2 Document Type: Business Plan

3. The action levels will include all the levels of risk determination and mitigation involved. First, the process would have to be initiated by means of defining potential problems. A risk management team would be brought into being in order to determine the specific risks involved. The quality inspector will lead the team, and be responsible for obtaining data of aircraft using our part. In terms of the teams working on the

Risk Management Integrated Emergency Planning an Emergency
Words: 1518 Length: 6 Document Type: Essay

Risk Management Integrated Emergency Planning An Emergency Risk Management Plan for a Large Supermarket in the UK Emergency Planning in the UK Risk Identification and Qualification PESTEL Framework Risk Identification Table Risk Qualification Matrix Risk Quantification Disaster Management Plan Situation Mapping of Hazards, Vulnerabilities and Impact Vulnerability Table Loss Estimation Resource Inventory Communication Management Plan Monitoring Plan This emergency management plan has been created for a large independent supermarket chain in the UK. The supermarket is comprised of six locations in total and all of the

Risk Management Explain the Difference
Words: 784 Length: 2 Document Type: Essay

The most effective security reporting procedure is to use the OCTAVE-based methodology. The reason why is because, they are utilizing solutions that will address the total nature of the threat in comparison with the others. For any kind of organization, this helps them to understand what kinds of issues that they could be facing and the impact that it will have on the entity itself. At the same time, it

Risk Management in British Hedge Funds
Words: 19188 Length: 60 Document Type: Dissertation

Risk Management in Hedge Funds A research of how dissimilar hedge fund managers identify and achieve risk The most vital lesson in expressions of Hedge Fund Management comes from the inadequate name of this kind of alternative investment that is an alternative: The notion that all methodical risks are differentiated away is not really applicable here, with the Hedge Fund returns, in realism, representing a mixture of superior administration of market

Sign Up for Unlimited Study Help

Our semester plans gives you unlimited, unrestricted access to our entire library of resources —writing tools, guides, example essays, tutorials, class notes, and more.

Get Started Now